NEWTickerr MCP is live →
tickerr
Swarmsourced · Tickerr
World's first swarmsourced LLM status platform
Major OutageResolvedOfficial report

Gemini Major Outage - July 18, 2026

Provider incident title: “RESOLVED: Google Cloud VMware Engine (GCVE), Google Cloud NetApp Volumes, and Bare Metal Solutions (BMS) services are experiencing a service outage in europe-west4-a due to a cooling failure.

Share on X

Started

Saturday, July 18, 2026

12:22 AM UTC

Duration

< 1 minute

total

Resolved

12:22 AM UTC

Jul 18, 2026

Severity: Major Outage|Affected: Gemini|Duration: < 1 minute

Incident Timeline

12:22 AM UTCResolved

&lt;p&gt; Incident began at &lt;strong&gt;2026-07-15 16:57&lt;/strong&gt; and ended at &lt;strong&gt;2026-07-16 05:25&lt;/strong&gt; &lt;span&gt;(all times are &lt;strong&gt;US/Pacific&lt;/strong&gt;).&lt;/span&gt;&lt;/p&gt;&lt;div class="cBIRi14aVDP__status-update-text"&gt;&lt;h1&gt;Preliminary Incident Report&lt;/h1&gt; &lt;p&gt;We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete.&lt;/p&gt; &lt;p&gt;If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using &lt;a href="https://cloud.google.com/support"&gt;https://cloud.google.com/support&lt;/a&gt;.&lt;/p&gt; &lt;h2&gt;Date/Time of the Issue (All time US/Pacific)&lt;/h2&gt; &lt;p&gt;&lt;strong&gt;Google Cloud VMware Engine Impact:&lt;/strong&gt;&lt;/p&gt; &lt;ul&gt; &lt;li&gt;Start: 15 July 2026 17:09&lt;/li&gt; &lt;li&gt;End: 16 July 2026 2:33&lt;/li&gt; &lt;li&gt;Duration: 9 Hours, 24 Minutes&lt;/li&gt; &lt;/ul&gt; &lt;p&gt;&lt;strong&gt;Google Cloud NetApp Volumes Impact:&lt;/strong&gt;&lt;/p&gt; &lt;ul&gt; &lt;li&gt;Start: 15 July 2026 16:39&lt;/li&gt; &lt;li&gt;End: 16 July 2026 01:10&lt;/li&gt; &lt;li&gt;Duration: 8 Hours 31 Minutes&lt;/li&gt; &lt;/ul&gt; &lt;p&gt;&lt;strong&gt;Bare Metal Solution Impact:&lt;/strong&gt;&lt;/p&gt; &lt;ul&gt; &lt;li&gt;Start: 15 July 2026 18:37&lt;/li&gt; &lt;li&gt;End: 16 July 2026 07:34&lt;/li&gt; &lt;li&gt;Duration: 12 Hours 57 Minutes&lt;/li&gt; &lt;/ul&gt; &lt;h2&gt;Summary&lt;/h2&gt; &lt;p&gt;On Wednesday, 15 July 2026, Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud NetApp Volumes experienced service interruptions for a total duration of 14 hours, 55 minutes. We are taking immediate steps to ensure this doesn’t happen again.&lt;/p&gt; &lt;h2&gt;Preliminary Root Cause&lt;/h2&gt; &lt;p&gt;A regional data center hosting services in europe-west4-a experienced a loss of utility power and subsequent cooling capacity.&lt;/p&gt; &lt;p&gt;The sequence of events leading to customer impact was as follows:&lt;/p&gt; &lt;ul&gt; &lt;li&gt;An electrical fault occurred on the utility grid upstream of the data center, disrupting the electrical distribution gear and cooling equipment.&lt;/li&gt; &lt;li&gt;The loss of cooling infrastructure resulted in ambient temperatures rising rapidly within the affected data halls. Host servers, storage clusters, and network switches were shut down to prevent equipment damages due to the extreme heat.&lt;/li&gt; &lt;li&gt;The high temperatures in the data hall resulted in disruption to customer workloads and control plane operations across the affected services.&lt;/li&gt; &lt;/ul&gt; &lt;p&gt;Google engineers have begun a full root cause analysis and we will provide additional information once it is available.&lt;/p&gt; &lt;h2&gt;Remediation&lt;/h2&gt; &lt;p&gt;Google engineering teams were alerted to the issue via automated temperature and hardware unreachability telemetry starting at 16:39 US/Pacific.&lt;/p&gt; &lt;p&gt;Engineers collaborated with the third-party facility provider to safely restore primary utility power and cooling systems, returning ambient room temperatures to safe operational levels. With the environment stabilized, field support engineers and remote teams systematically booted and verified the server hosts, storage nodes, and network fabric in a controlled sequence. Automated recovery playbooks were executed to restore underlying network switches and routing infrastructure, allowing storage appliances and compute clusters to be brought back online and verified for health. The underlying infrastructure has been fully recovered, and normal operations have been successfully restored.&lt;/p&gt; &lt;h2&gt;Description of Impact&lt;/h2&gt; &lt;p&gt;On 15 July 2026 from 16:39 to 16 July 2026 07:34 US/Pacific, customers experienced service disruptions across several products in europe-west4-a zone:&lt;/p&gt; &lt;ul&gt; &lt;li&gt;&lt;strong&gt;Google Cloud VMware Engine:&lt;/strong&gt; Customers lost connectivity to their private clouds and workloads as foundational hosts and network switches were powered off for thermal protection.&lt;/li&gt; &lt;li&gt;&lt;strong&gt;Bare Metal Solution:&lt;/strong&gt; Customers experienced connectivity loss to their database servers and storage appliances as the underlying hardware was powered down.&lt;/li&gt; &lt;li&gt;&lt;strong&gt;Google Cloud NetApp Volumes:&lt;/strong&gt; Customers in the STANDARD, PREMIUM, and EXTREME service levels were unable to access their storage volumes. Control plane operations, including the creation of new storage pools, volumes, and backups, experienced failures in the affected region.&lt;/li&gt; &lt;/ul&gt; &lt;/div&gt;&lt;hr&gt;&lt;p&gt;Affected products: Bare Metal Solution, Google Cloud NetApp Volumes, VMWare engine&lt;/p&gt;&lt;p&gt;Affected locations: Netherlands (europe-west4)&lt;/p&gt;

Get alerted next time

Install Tickerr MCP — your agent auto-reports & routes around outages

When Gemini goes down again, your agent reports anonymously and instantly gets a fallback recommendation from the swarm.

$claude mcp add tickerr --transport http --url https://tickerr.ai/mcp
Install free →

Gemini is back online

View current status and uptime history

Gemini status →

About This Report

Gemini 30-day uptime: 100% based on Tickerr's independent monitoring checks.

This incident was sourced from Gemini's official status RSS feed. Tickerr polls RSS feeds every 10 minutes and merges updates from the same outage into a single incident timeline.

This incident lasted < 1 minute.

Tickerr monitors 90+ AI tools independently. View live Gemini status or all AI tool status.

Other Gemini incidents

Jul 20, 2026
Jul 16, 2026
Degraded Performance

gemini-2.5-flash-lite API Latency Degraded

Jul 15, 2026
Jul 14, 2026
Degraded Performance

gemini-2.5-flash-lite API Latency Degraded

Jul 14, 2026

View all Gemini incident history →

Get alerted next time Gemini goes down

Tickerr monitors 90+ AI tools. We'll email you when an incident starts or resolves.

Weekly AI pricing & uptime digest

Price drops, new model releases, and incident summaries - every Monday. Free.

Also on Tickerr

Gemini live statusGemini pricingAll AI tool statusAI model pricingCompare AI toolsAI updates